Noise Barriers A74

The noise barriers have been installed on a stretch of 4 kilometres alongside the new motorway that will provide a better connection between the Dutch and German network of primary roads. The Construction of the new motorway started in 2010 and is expected to be completed in spring 2012.
Scheuten supplied 30,000 m² silk screen printed glass made out of several compositions. The float glass was produced in the new float glass factory in Osterweddingen (Germany). At this plant Scheuten produces extra clear glass which improves transparency and light transmission.

The engineering of the glass details and the integration in the steel Construction along the A74 was carried out by Scheuten Absoluut Glastechniek